NewHydroANTRACK AR22
BitmainHydro rack on castors for four miners, with its own heat exchanger.

A 1.5 MW hydro mining container with 308 rack spaces and its dry tower stacked on top.
The HD5 is a hydro mining container with 308 rack spaces at 1,500 kW. The racks, pumps and electrical cabinets sit in the lower container; the dry tower forms a deck on top, with its heat exchangers in a V along both sides.
Like the HW7 it is a complete unit for a site with a grid connection: the transformer, the foundation and the permits are part of the site work, the container brings everything between the power connection and the machines.
Manufacturer reference values, confirmed on the quote. Dimensions, weight, input voltage and operating temperature on request.
The building decision sets your cost per megawatt, your time to energisation and how easily you can leave. Three routes, and the honest case for each.
Water cooled machines hold the efficiency frontier and they are quiet enough to put near people. They also come with a construction project attached, and that is the part to price before the hardware.
The machines are the short lead time. The electrical and thermal capacity they need is the long one, and it has to be finished before the first pallet lands.
Every watt you buy comes back out as heat. Whether that heat is a disposal cost or a second revenue line depends on one number: the temperature you can deliver it at.
The cooling route you pick decides which machines you can even consider, how loud your site is, and how much you spend before the first miner is switched on.
NewHydroHydro rack on castors for four miners, with its own heat exchanger.
NewHydroHydro cabinet for 20 Antminer U2 Hydro, for your own cooling loop.
NewHydroThe AR30 cabinet and its own dry cooler, as one set.
NewHydroHydro container for 242 Antminer S23e U2H, coolers on top.
NewChillerCold storage that gives an ANTSPACE container extra cooling.